SOHO Daily Meeting Minutes for Tuesday, 02 July 2002 ANNOUNCEMENTS ------------- * RHESSI target for today is AR 0019; target for tomorrow is TBD. * Friday's SVM reserved time has been scheduled for 13:30 to 15 UT instead of 14-15 UT. As usual no NRT is available during this time. * Next lecture in the series by Prof. Tyan Yeh will be today at 11am in the EAF on Magnetic Structure of a Flux Rope with Circular Cross-Sections * Security scans for EOF and EAF scheduled for 3 July at 10am * Thursday 4 July is a holiday. There will be a student ECS operator in the office from about 11am-4pm. * If the CONTOUR launch slips from tomorrow we could have DSN schedule changes for later this week. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: VIRGO, CDMU/ACU Memory Dumps Planned Activities: VIRGO, SWAN, RSL, New tracking star, mag = 7.1 Upcoming Operations: None Ground Anomalies: 182/1220 Invalid clock correlation output due to failed Timing Distribution System and incorrect TGC settings at D27. Lost 1 minute 13 seconds of unrecoverable TLM at 1558 during TGC swap. 182/1444 Wayward command delayed NRT activities 6 minutes. 182/1808 Lost 58 minutes 57 seconds of TLM and CMD due to a SCP failure at D27. Initial 2 minutes 29 seconds of TLM is unrecoverable, the remainder can be retrieved from the CDR. 182/2054 Wayward command delayed NRT activities 4 minutes. 182/2106 Power outage at D27 resulted in 1 hour 53 minutes 34 seconds of lost TLM and CMD. D46 brought up early or support, and covered last 61 minutes 15 seconds of stated outage. Initial 52 minutes 19 seconds of TLM are unrecoverable. 183/0801 Invalid clock correlation data due to TCA failure at D66. SOLAR STATUS ------------ 07/01 DOY 182 - 07/02 DOY 183 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20020702.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm INSTRUMENT STATUS ----------------- CDS: Nominal. Polarity reversal study in the south, sunspot studies on AR 0016. Tomorrow: active region studies on AR 0019. UVCS: Nominal. Coronal hole/streamer interface study and long synoptic. Tomorrow: coronal hole/streamer interface study and mini-synoptic. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and dopplergrams. TRACE: Nominal. Supporting DOT/THEMIS observations and RHESSI on AR 0019, and running a flarewatch program.