SOHO Daily Meeting Minutes for Tuesday, 09 July 2002
ANNOUNCEMENTS
-------------
* RHESSI target for today is AR 0019; target for tomorrow
is the un-numbered region on the northeast limb.
* There will be visitors in the EOF today from 2-4pm.
* PMI contractors are scheduled to perform corrective maintenance
on the UPS-20 system tomorrow from 9AM until 4:30PM. No impact
to operations is expected.
* Solar science seminar on Wednesday 10 July at 3:30pm in EAF by
Spiro Antiochos on Evidence that Coronal Heating is NOT Impulsive
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies:
190/1230 - CDS mnemonic violated YH limit (CTM19 = 34 deg C)
Accomplished Activities: VIRGO, SWAN, NONCOHO
Planned Activities: VIRGO, RSL, New Guide Star (7.1 mag)
Upcoming Operations: None
Ground Anomalies:
189/2112 - TM Dropout; D27 TCA halted (3 minutes, unrecoverable)
190/0602 - Degraded Data; JPL Comm line hits during D66 pass
(11 minutes, recoverable)
SOLAR STATUS
------------
07/08 DOY 189 - 07/09 DOY 190
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020709.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. Full sun observation. Tomorrow: CME watch
in the northeast in support of RHESSI.
UVCS: Nominal. Flat field calibration and long synoptic. Tomorrow:
coronal hole/streamer interface study and mini-synoptic.
LASCO: Nominal. C2/C3 synoptics and hourly C2 pB images.
Tomorrow: JOP159 support.
EIT: Nominal. 195 CME watch and synoptic.
MDI: Nominal. Full disk magnetograms and dopplergrams.
TRACE: Nominal. Follow the evolution of AR0019 in support of
RHESSI.