SOHO Daily Meeting Minutes for Tuesday 16 March 2004 ANNOUNCEMENTS ------------- * Due to the scheduled EIT bakeout and TRACE engineering, there will be at least 1.5 days without any full disk EUV data for planning, starting Thursday at about 00 UT. * The current RHESSI default target is AR10570. When selecting this target to maximize coordination w/others, use campaign number 6850. * NRT will be very tight starting this week and delayed command loads will need very large uplink windows (several days) in case station problems delay their uplink. There will also be more SVM activities than usual, at unusual times. Please check with Emily about ANY commanding plans. FOT REPORT ---------- Spacecraft Status: Nominal Inverted Roll Position Spacecraft Anomalies: None Accomplished Activities: UVCS safing activities Planned Activities: SWAN, RSL Upcoming Operations: Keyhole Operations begin 3/19 Ground Anomalies: 075/2146 - Spacecraft RCVR-2 lost lock due to D24 transmitter interlock (NRT paused 14 minutes) 075/2236 - TM Dropout from D24; Cause unknown (4 minutes, unrecoverable) SOLAR STATUS ------------ 03/15 DOY 075 - 03/16 DOY 076 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20040316.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Polarity reversal monitoring at the north and south poles, quiet sun spectral atlas at sun center. UVCS: Nominal. In a safe configuration for the keyhole period. LASCO: Nominal. C2/C3 synoptics. Tomorrow: C2/C3 synoptics, JOP159. EIT: Nominal. 195 CME watch and synoptics. Tomorrow: 195 CME watch and synoptics, JOP159. Bakeout begins early Thursday morning. There will be no observations after Wednesday. MDI: Nominal. 96 minute magnetograms. Full disk magnetogram and dopplergram campaign when in VC2. TRACE: Nominal. Observing AR10570 then beginning several days of engineering studies. There will be no observations again until Friday.