SOHO Daily Meeting Minutes for Monday 21 June 2004 ANNOUNCEMENTS ------------- * Please plan all commanding with the SOCs as NRT is very tight. * The timeline for the 22 June 2004 maneuvers is at http://sohowww.nascom.nasa.gov/soc/timeline_22Jun2004 * The preventive maintenance on 3-UPS-15 scheduled for June 24 has been cancelled and will be rescheduled for a later date. * The current RHESSI default target is AR10635. When selecting this target to maximize coordination w/others, use campaign number 6850. * SPWG Friday in EOF after daily and weekly planning meetings. Please submit calendar changes to the SOCs soon. FOT REPORT ---------- Spacecraft Status: Nominal, keyhole configuration Spacecraft Anomalies: Accomplished Activities: 170 RSL, VIRGO, SWAN, keyhole load, nominal daily activities 171 Transition to keyhole configuration, keyhole load, TR on, nominal daily activities 172 Keyhole loads, nominal daily activities Planned Activities: Keyhole loads, nominal daily activities Upcoming Operations: Keyhole 16 Jun - 3 Jul Maneuver 22 Jun MDI continuous 4 Jul - 5 Sep Ground Anomalies: 170/1705 - history file transfer errors on string 4 170/1921 - CCL 95 down briefly 171/0127 - D46 corrupted command, 7 minutes NRT interruption 171/1120 - SH4WS2 locked up 171/1515 - D66 carrier up 7 min late, problem with uplink equipment 172/0518 - D63 unable to lock on 3-way downlink, 17 minutes 42 seconds lost TM (unrecoverable) 172/2220 - D43 unable to lock on 3-way downlink, 21 minutes lost TM (unrecoverable), QCI failure Other: SOLAR STATUS ------------ 06/18 DOY 170 - 06/21 DOY 173 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20040621.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Full sun scan then safing for maneuvers at 16 UT. Recovery will be on Wednesday at 23 UT. UVCS: Nominal. UVCS is in a safe configuration for the SOHO keyhole. LASCO: Nominal. Safing for maneuvers at 15:30 UT. Recovery will be on Thursday at 14:30 UT. EIT: Nominal. EIT is in bakeout through the keyhole. MDI: Nominal. 96-minute magnetograms in VC01 when recorded or downlinked. Full disk magnetograms and continuum images if/when VC2 is available. TRACE: Nominal. AR10634 observations and full disk mosaics.