SOHO Daily Meeting Minutes for Tuesday 04 September 2007 (DOY 247) Prepared by: Gavin Westenburger ANNOUNCEMENTS ------------- * The delayed command load submission system on the ECS computers is still not working. Please submit all loads via email to soc@soc.nascom.nasa.gov. * Delta ORR for automation is on Thursday 6 September at 10:15AM local time. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 245/1517 One Single DMA Failure over One Format. Accomplished Activities: DOY 243 Nominal Daily Activities, Roll Manuever, SWAN, VIRGO, RSL DOY 244 Nominal Daily Activities, MDI DOY 245 Nominal Daily Activities, NONCOHO, SWAN DOY 246 Nominal Daily Activities, MDI, Transponder Swap Planned Activities: Nominal Daily Activities, RSL Upcoming Operations: Ground Anomalies: 245/1458 Corrupted Command during LASCO Commanding (DSS54). 9 minutes delay in LASCO NRT commanding. 246/1839 Antenna Movement after HGA Table Upload (DSS24). 247/0456 Loss of Telemetry due to Possible RFI (DSS34). 1.75 minutes loss of telemetry - unrecoverable. Nighttime NRT for Today and Tomorrow: During all passes between 2300 - 1100, except for some short pauses. INSTRUMENT STATUS ----------------- CDS: Nominal. Keyhole operations. UVCS: In safe configuration for the keyhole. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and Dopplergrams, ALT Cadence: 96 minutes. TRACE: Nominal. Observing magnetic structures of young active regions in support of Sac Peak operations. Questions, corrections, and updates: soc@soc.nascom.nasa.gov