SOHO Daily Meeting Minutes for Friday 21 September 2007 (DOY 264) Prepared by: Emily Zamkoff ANNOUNCEMENTS ------------- * The delayed command load submission system on the ECS computers is still not working. Please submit all loads via email to soc@soc.nascom.nasa.gov. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 264/0947 CEPAC ESU Data Request Error (3 minutes 29 seconds lost CEPAC data) Accomplished Activities: Nominal Daily Activities,SWAN (OCD 2262),new tracking star Planned Activities: Nominal Daily Activities, RSL, VIRGO Upcoming Operations: None Ground Anomalies: 263/1224 (9/20) Loss of Command due to Autotrack (4 minute command loss) 263/1604 (9/20) Loss of TLM - JPL/Goldstone Network (71 TLM loss - 51 minutes recoverable from SSR) 263/2140 (9/20) Late AOS due to MCP (2 minutes TLM loss - recoverable from SSR) 264/0555 (9/20) Late AOS - Madrid LAN (123 minutes TLM loss - recoverable from SSR) Nighttime NRT for Today and Tomorrow: During all passes between 2300 - 1100, with some short pauses INSTRUMENT STATUS ----------------- CDS: Nominal. Polar coronal hole tornadoes, blinkers on the limb, solar network variability and dynamics, engineering. Saturday: explosive event monitor, off-limb coronal study at the north pole. Sunday: off-limb coronal study at the south pole, temperature and density structure of the quiet solar corona. Monday: solar network variability and dynamics, polar coronal hole tornadoes, EIS and CDS spectral atlas. UVCS: Nominal. Observing HI Lyman alpha at large heights. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and Dopplergrams. TRACE: Nominal. Observing north pole, SOT/TRACE polar study. Questions, corrections, and updates: soc@soc.nascom.nasa.gov