SOHO Daily Meeting Minutes for Monday 15 October 2007 (DOY 288) Prepared by: Gavin Westenburger ANNOUNCEMENTS ------------- * The delayed command load submission system on the ECS computers is still not working. Please submit all loads via email to soc@soc.nascom.nasa.gov. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 287/0920 CEPAC ESU Data Request Error (CEPAC not producing data for 4 minute, 24 second) Accomplished Activities: DOY 285: Nominal Daily Activities, VIRGO DOY 286: Nominal Daily Activities, TTD46_07286, MDI01456 DOY 287: Nominal Daily Activities, FSM collection Planned Activities: Nominal Daily Activities, release star 4 Upcoming Operations: None Ground Anomalies: 285/0632 Corrupted command (84 minute command outage) 285/1932 TLM & Voice Outage - Line Outage (3 minute, 11 second TLM loss) DR#C105918 286/2040 Delayed Commanding - RX2 lost lock (3 minute, 10 second commanding delay) DR#C105922 286/2137 Loss RCVR Lock - Unknown (12 minute commanding loss) DR#C105922 287/1548 TLM Loss/RCVR Drop Lock - Ant Stopped (8 minute, 51 second TLM loss, 12 minute command loss, 1600 MAG lost) DR#G108099 287/1920 Ranging not performed - No Lock RX 1 (37 minute command loss, 9 hour, 50 minute ranging loss) DR#C105923 Nighttime NRT for Today and Tomorrow: During all passes between 2300 - 1100, with some short pauses INSTRUMENT STATUS ----------------- CDS: Nominal. Full spectral full Sun scan. UVCS: Nominal. Coronal hole study. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. High resolution magnetograms, Dopplergrams and filtergrams. TRACE: Nominal. Supporting the THEMIS-DOT campaign, observing an active region in the South East quadrant. Questions, corrections, and updates: soc@soc.nascom.nasa.gov