SOHO Daily Meeting Minutes for Tuesday 02 September 2008 (DOY 246) Prepared by: Tero Siili ANNOUNCEMENTS ------------- * SOHO will be in record for the D27 DSN Service Preparation Subsystem (SPS) test passes on 3 and 4 Sep 2008 * The delayed command load submission system on the ECS computers is working now but needs testing before it can be used. Please be in touch with the SOCs if you need to send a load. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal, TR ON, TRSP1 ON Spacecraft Anomalies: 244/1029 CEPAC ESU Data Request Error Accomplished Activities: 242 RSL, VIRGO load 243 Nominal Ops 244 Nominal Ops 245 Keyhole Configuration 26 meter exit Planned Activities: Slot 5 New Guide Star RSL TR Off Upcoming Operations: Nominal Ops Ground Anomalies: 243/2108 D45 63 min Loss of CMD - CMD System Problem 245/1519 D27 5 min Delayed Command - Corrupted CMD Nighttime NRT for Today and Tomorrow: See FTP's Activity Plan INSTRUMENT STATUS ----------------- CDS: Nominal. Solar network variability and dynamics. UVCS: Nominal. Physical parameters of the slow and fast solar wind across the sonic point. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and Dopplergrams, doing calibrations. TRACE: Nominal. Quiet Sun observations. Questions, corrections, and updates: soc@esa.nascom.nasa.gov