This is the draft of the script for the IIDE test to be performed on Saturday March 23. FOT is currently reviewing it. Please send me your comments as soon as possible. Thank you Eliane Larduinat _____________________________________________________________ Script for the IIDE test ______________________________________________________________ Date : Saturday March 23, 1996, starting at 15:00 Purpose: Test the functionality of the Inter_Instrument Data Exchange (IIDE) capabilities The test will be conducted in 3 main phases, each phase with a different instrument as master. The test will verify that each master can generate a flag when a given event occurs and send to the receivers an OBDH block command containing the coordinates of the event in (Xii, Yii) coordinates in units of 2 Arcsec. ______________________________________________________________ SET-UP FOR TEST Participating instruments: CDS, SUMER, LASCO/EIT, UVCS and MDI Test Coordinator: 'SOC de service' VOICE LINK All parties check CCL 95 prior to test Announcements: FOT announces each step such as Master/Receiver selection Master instrument announces start of programs/studies, occurrence of events and flag distribution when possible CDS and SUMER pointed at Sun Center (to allow coordinates to be in CDS field of view) ______________________________________________________________ PREPARATION FOR TEST TSTOL Enable IIDE 10 mins NRT-s Set-up CDS for IIDE 30 mins ______________________________________________________________ TEST PART 1 SUMER MASTER TSTOL 20 mins (CCL) FOT announces that SUMER will be set as master Set SUMER as master Set LASCO/EIT, CDS UVCS, MDI as receivers (CCL) FOT confirms master/receiver configuration NRT-s 30 mins (CCL) SUMER announces that they are ready to trigger an event SUMER manually triggers the flag (via NRT command) NOTE: The event must occur within 16 minutes of CDS being set at receiver or CDS IIDE set-up proc should be run again. Master instrument records the event and coordinates it sent. Each receiver instrument monitors its telemetry: verify reception of a valid OBDH block command containing the proper validity flag. record the event Id and the Sun coordinates (CCL) Each receiver announces reception of coordinates TSTOL 20 mins (CCL) FOT announces that SUMER will be set as master Set SUMER as master Set LASCO/EIT, CDS UVCS, MDI as receivers (CCL) FOT confirms that SUMER was set as master NRT-s 30 mins (CCL) SUMER announces that they are ready to trigger an event SUMER starts as a program and detects an explosive event NOTE: The event must occur within 16 minutes of CDS being set at receiver Master instrument records the event and coordinates it sent. Each receiver instrument monitors its telemetry: verify reception of a valid OBDH block command containing the proper validity flag. record the event Id and the Sun coordinates (CCL) Each receiver announces reception of coordinates ______________________________________________________________ TEST PART 2 CDS MASTER TSTOL 20 mins (CCL) FOT announces that CDS will be set as master Set CDS as master Set LASCO/EIT, SUMER UVCS, MDI as receivers (CCL) FOT confirms master/receiver configuration NRT-s 30 mins (CCL) CDS announces that they are ready to start CDS runs study pointing at Sun Center (Event will be triggered within 1 minute. threshold = 0) Master instrument records the event and coordinates it sent. Each receiver instrument monitors its telemetry: verify reception of a valid OBDH block command containing the proper validity flag. record the event Id and the Sun coordinates (CCL) Each receiver announces reception of coordinates ______________________________________________________________ TEST PART 3 EIT /LASCO MASTER EIT/LASCO will not be able to support this part of the test. ______________________________________________________________ TSTOL 10 mins Disable IIDE ESTIMATED TIMELINE See Schedule for Saturday March 23