File cds_sheet3.txt -- Last modified Thu Sep 28 16:33:47 1995 COMMISSIONING PHASE BLOCK SHEET 1. INSTRUMENT AND BLOCK NUMBER: CDS, Block 3 2. BLOCK IDENTIFICATION: CDS Calibration 3. PURPOSE: Prepare CDS for scientific observations 4. SUB-BLOCKS: NR. IDENTIFICATION 3.1 NIS first light 3.2 GIS first light 3.3 Coarse pointing calibration 3.4 GIS first light continued 3.5 Fine pointing calibration 3.6 NIS first light continued 3.7 First light study 3.8 NIS raster test 1 3.9 GIS raster test 1 3.10 GIS raster test 2 5. SUB-BLOCKS TABLE: NR. - DURATION - PREVIOUS - COMMANDING - TELEMETRY - POINTING 3.1 16:00 Nom NRT-s H Nom 3.2 16:00 Nom NRT-s H Nom 3.3 4:00 Nom NRT-s H Nom 3.4 8:00 Nom NRT-s H Nom 3.5 8:30 Nom NRT-s H Nom 3.6 8:00 Nom NRT-s H Nom 3.7 16:00 Nom NRT-d* H Nom 3.8 8:00 Nom NRT-s H Nom 3.9 8:00 Nom NRT-s H Nom 3.10 8:00 Nom NRT-s H Nom [* for 3.7 - first 4 hours NRT-d, the rest NRT-s] 6. SCHEDULING REQUIREMENTS: Subblocks with duration of more than 8:00 hours on subsequent days during NRT reserved time. Check ordering of subblocks, they may be interchangeble! 7. SPECIAL REQUIREMENTS: None (check for jitter) 8. SUCCESS CRITERIA AND/OR EXPECTED OUTPUT: CDS fully calibrated and prepared for science observations 9. RELEVANT PROCEDURES None (check) 10. CROSS-REFERENCE TO TEST SHEETS: (list identifiers for test sheets) TBP by CDS 11. RELEVANT SECTION OF TIMELINE (backpage) BLOCK3 -- CDS CALIBRATION ; >>>>>>>>>>>>>>>>>> FIRST NIS SPECTRUM <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< ; BLOCK3.1a -- NIS FIRST LIGHT 44 & 08:00 # CDS-NIS First Light Study #Incl. TEST2 ; No repointing, Run TEST2 (3 NIS slits, no raster, full CCD dumps) ; run VDS engineering checks (Duration 2 days) ; ; >>>>>>>>>>>>>>>>>> FIRST GIS SPECTRUM <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< ; BLOCK3.2a -- GIS FIRST LIGHT 46 & 08:00 # CDS-GIS First Light Study # ; No repointing, raw data dumps on all slits, no raster, ; produce raw data solar spectrum, start to construct LUTs ; (Duration 2 days) BLOCK3.3 -- COARSE POINTING CALIBRATION 48 & 08:00 # CDS Coarse Pointing Calibration #TEST3 ; Uses ZOD no need for GIS calibration. Duration 4 hrs. 49 & 08:00 # CDS-GIS First Light Study (continued) #Further raw data dumps BLOCK3.2b -- GIS FIRST LIGHT (Cont...) 44 & 08:00 # CDS-GIS First Light Study # ; Further raw data dumps and checks. Duration 1 day. BLOCK3.4 -- FINE POINTING CALIBRATION 50 & 08:00 # CDS Fine Pointing Calibration #TEST4 ; Uses GIS band 2 total - no need for GIS calibration. Duration 8.33 hrs. BLOCK3.1b -- NIS FIRST LIGHT (Cont...) 51 & 08:00 # CDS-NIS First Light Study #Incl. TEST2 ; Additional runs of TEST2 and eng. checks. Duration 1 day. BLOCK3.5 -- FIRST LIGHT STUDY 52 & 08:00 # CDS-GIS First Light Study (continued) #TEST1 ; TEST1 (2x2 slit, no raster, full GIS output) ; First run with LUTs installed BLOCK3.6 -- NIS RASTER TEST 1 53 & 08:00 # CDS-NIS Raster Test 1 #TEST6 BLOCK3.7 -- GIS RASTER TEST 1 54 & 08:00 # CDS-GIS Raster Test #TEST5 BLOCK3.8 -- GIS RASTER TEST 2 55 & 08:00 # CDS-NIS Raster Test 2 #TEST7