File cepac_sheet1.txt -- Last modified Thu Aug 17 17:29:35 1995 1. INSTRUMENT AND BLOCK NUMBER: CEPAC, Block 1 2. BLOCK IDENTIFICATION: CEPAC Early Switch-on 3. PURPOSE: Early switch-on to enable biasing of EPHIN Li-drifted detectors 4. SUB-BLOCKS NR. IDENTIFICATION 1.1 CEPAC Switch-on 1.2 EPHIN high voltage switch-on 1.3 ESU TCA initialisation 1.4 ESU TCA adjustment 5. SUB-BLOCKS TABLE: NR. - DURATION - PREVIOUS - COMMANDING - TELEMETRY - POINTING 1.1 0:15 N/A PROC M None 1.2 0:04 Nom PROC M None 1.3 0:10 Nom PROC M None 1.4 0:10 Nom PROC M None Note: Duration is without contingency. In this and all other blocks telemetry mode is indifferent as long as both HK and SCI telemtry is available. 6. SCHEDULING REQUIREMENTS: Latest on day 5. 1.4 one day after 1.3 Note: Here and below I have given the times of the present timeline as the latest possible. 7. SPECIAL REQUIREMENTS: ESU in or near thermal equilibrium before 1.1. 8. SUCCESS CRITERIA AND/OR EXPECTED OUTPUT: ESU switched on in safe/standby mode, EPHIN in nominal observation mode, LION in ON mode, and HK nominal. ESU temperature stabilises near to the same value as before switch-on. 9. RELEVANT PROCEDURES: 1.1 H_FL_ONNOM 1.2 H_FL_FOBS 1.3 H_FL_ETCAINIT 1.4 H_FL_ETCAINIT 10. CROSS-REFERENCE TO TEST SHEETS: TBS 11. RELEVANT SECTION OF TIMELINE: Day 5, 13:00 - 18:00