File cepac_sheet3.txt -- Last modified Tue Aug 15 10:13:39 1995 1. INSTRUMENT AND BLOCK NUMBER: CEPAC, Block 3 2. BLOCK IDENTIFICATION: Thermal Adjustment and Initial ESU Switch-on 3. PURPOSE: To verify ESU thermal behaviour in observation mode 4. SUB-BLOCKS NR. IDENTIFICATION 3.1 Thermal adjustment 3.2 ESU initial switch-on 5. SUB-BLOCKS TABLE NR. - DURATION - PREVIOUS - COMMANDING - TELEMETRY - POINTING 3.1 0:10 Nom PROC M None 3.2 0:04 Nom PROC M None 6. SCHEDULING REQUIREMENTS: Latest on day 13. 7. SPECIAL REQUIREMENTS: None 8. SUCCESS CRITERIA AND/OR EXPECTED OUTPUT: ESU in observation mode (ON) and HK nominal. ESU temperature remains between 15-20 C. 9. RELEVANT PROCEDURES: 3.1 H_FL_TCAINIT 3.2 H_FL_EINITOBS 10. CROSS-REFERENCE TO TEST SHEETS: TBS 11. RELEVANT SECTION OF TIMELINE: Day 13, 10:20 - 12:40