SOHO COMMISSIONING: DRAFT SCHEDULE FOR INSTRUMENT INTERCALIBRATION SUGGESTED INTERCALIBRATION JOP SCHEDULE (from SICWG January 1995) ------------------------------------------------------------------ DAY SINCE GSFC TIME JOP INVOLVES LAUNCH 90 07:00 Intercalibration 1 * CDS/SUMER/EIT/UVCS 91 07:00 Intercalibration 2 * CDS/SEM/EIT/SUMER/UVCS 110 07:00 Intercalibration 1 * CDS/SUMER/EIT/UVCS 111 07:00 Intercalibration 2 * CDS/SEM/EIT/SUMER/UVCS 120 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 121 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS (assume s/c commissioning takes N days) 121+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 122+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS 135+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 136+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS 149+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 150+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS 163+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 164+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS 177+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 178+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS 191+N 07:00 Intercalibration 1 CDS/SUMER/EIT/UVCS 192+N 07:00 Intercalibration 2 CDS/SEM/EIT/SUMER/UVCS (cycle falls to once every 4 weeks when agreed) * = These "pre-L1" intercalibration activities will be supported by instruments as they become available. CDS/SUMER JOPS: DAY SINCE GSFC TIME JOP INVOLVES LAUNCH 125+N 07:00 SUMER/CDS/EIT/MDI ALIGN CAL CDS/SUMER/EIT/MDI 126+N 07:00 SUMER/CDS INTENS CROSS CAL CDS/SUMER 153+N 07:00 SUMER/CDS/EIT/MDI ALIGN CAL CDS/SUMER/EIT/MDI 154+N 07:00 SUMER/CDS INTENS CROSS CAL CDS/SUMER 181+N 07:00 SUMER/CDS/EIT/MDI ALIGN CAL CDS/SUMER/EIT/MDI 182+N 07:00 SUMER/CDS INTENS CROSS CAL CDS/SUMER ESTIMATED DURATIONS: INTERCALIBRATION 1 - 150-200 minutes (depending on instrument) INTERCALIBRATION 2 - 140-160 minutes (depending on instrument) SUMER/CDS/EIT ALIGN - 160-175 minutes (depending etc...) SUMER/CDS INT CROSS-CAL - 94-112 minutes (depending etc...) Clearly there can be some flexibility. However, we have always listed the EIT high telemetry period as 06:30 to 07:00 and, rather than leave an awkward hour before the JOP start, I have listed them from 07:00. All of the times are Goddard time!!!!!!!