File sumer_sheet2.txt -- Last modified Wed Nov 1 15:02:05 1995 COMMISSIONING PHASE BLOCK SHEET 1. INSTRUMENT AND BLOCK NUMBER: SUMER, Block 2 2. BLOCK IDENTIFICATION: SUMER Functional Commissioning 3. PURPOSE: Verify SUMER functionality 4. SUB-BLOCKS: NR. IDENTIFICATION 2.1 Final Commissioning of Mechanisms 2.2 Switch OFF Non-operational Heaters 2.3 Final Commissioning of Electronics 2.4 Thermal Control Checkout 2.5 Open Door (verify deflector HV on) 2.6 Final Commissioning Detector A 2.7 Final Commissioning Detector B 2.8 Close Door Partially 5. SUB-BLOCKS TABLE: NR. - DURATION - PREVIOUS - COMMANDING - TELEMETRY - POINTING 2.1 4:20 Nom PRO, NRT-d H None 2.2 0:10 Nom PRO M None 2.3 2:00 Nom NRT-d H None 2.4 1 week (1) Nom None (HK) M None 2.5 0:30 Nom NRT-d H None 2.6 4:00 (2) Nom NRT-d H Nom 2.7 4:00 (2) Nom NRT-d H Nom 2.8 0:30 Nom NRT-d H None (1) 2.4 requires one week of monitoring HK only (2) 2:00 out of 4:00 can be NRT-s if needed 6. SCHEDULING REQUIREMENTS: 2.1 After MCC2, and about 14 days after block 1. Switch OFF non-op heaters beforehand, back ON afterwards 2.2 About 24 days after 2.1 (to complete outgassing). 2.3 About 4-6 days after 2.2 2.4 To start as soon as 2.3 is completed 2.5-2.8 In series, anytime after 2.4. In time for Spectral Atlas together with CDS (presently planned for day 77) 2.8 Can be omitted if 3.1 follows right after it 7. SPECIAL REQUIREMENTS: Coordination with FOT required for non-operational heaters switch ON and switch OFF 8. SUCCESS CRITERIA AND/OR EXPECTED OUTPUT: SUMER functionally verified 9. RELEVANT PROCEDURES None 10. CROSS-REFERENCE TO TEST SHEETS: (list identifiers for test sheets) To be supplied