DRAFT MINUTES FOR SOHO SPWG MEETING ON 20080725 Latest Update: $Date: 2008/07/25 13:46:36 $ $Author: tsiili $ $Revision: 1.13 $ Change log is at the end of the document. 1. Boundary conditions a) Orbit, attitude and manoeuvres - SOHO is in upside down roll position (180 deg). - manoeuvres To the degree possible, manoeuvres take place during the last days of 34-m keyholes. Currently proposed or set manoeuvre dates are: Aug 21 (TBC) station-keeping, momentum management, roll Aug 22 (TBC) manoeuvre backup date Nov DD (TBC) station-keeping, momentum management, roll; tentative dates are Nov 11, 18 or 19 b) Communications with the spacecraft Graphical DSN schedule: http://soho.nascom.nasa.gov/soc/dsn/ Keyhole dates for the next 6 months (All available keyhole information is at or via http://soho.nascom.nasa.gov/soc/keyholes.html): * Aug 01-30 26m Keyhole * Aug 08-22 34m Keyhole * Nov 05-22 26m Keyhole * Nov 09-18 34m Keyhole * Jan 25-Feb 21 26m Keyhole * Feb 1-14 34m Keyhole - DSN D45 and D65 (34-m) antennae status D45 and D65 are currently down-link/telemetry-only, but are being upgraded with up-link/commanding capabilities. The estimated time for the upgrade to be operational is at the end of July. - End-of-pass handling during MDI continuous contact periods To avoid problems with transmitter masks at the end of passes during MDI continuous, DSN has requested we bring the carrier down 30 min before the end of pass. As a result, the last 30 min of all MDI continuous contacts will be TM only. For ranging passes, the spacecraft will be transitioned to record ~1 h before the end of the pass. The station will drop the carrier and re-sweep into receiver 2. The spacecraft will then be transitioned back to VC2 and VC3. c) KNOWN submode (SM) dependent activities/submode changes: * TOO JOP153/MMOP003 Future Major Flare Watch (SM5 if SUMER observes target, SM6 otherwise) * Jul 23,30 EIT Shutterless #32 TBC (SM6) * Nov SUMER campaign TBD (SM5) SUMER campaign dates may overlap with keyholes. Such overlaps shall be scheduled only if periods of no SUMER data between passes are acceptable. Except for Major Flare Watches, TRACE will be doing full disk mosaics if/when EIT is not able to do synoptic sets due to keyhole operations. SUMER says there is no decision yet, but November campaign is unlikely to happen. For EIT Shutterless #32 times see section 2a. d) Instrument maintenance activities EIT bake-out periods will be during keyholes. August bake-out not defined at this time, but will be very soon. e) Others TRACE summer eclipse season began on 10 May 2008 and according to latest predicts will end on 22 Jul 2008. The next eclipse season will begin on 10 Sep 2008. There is no predicted end for that eclipse season. Attended automated daytime passes will begin during the week starting Mon 16 Jun. Unattended daytime automation will begin 1 October. 2. Priorities for the coming month and more a) Joint observing plans and campaigns Continuing campaigns: * 2002/02/25-- JOP136 Default RHESSI Collaborations (#6850), POC: Tero Siili * 2003/05/13-- Default CDS Co-observations with TRACE (#6950) * 2005/09/20-- JOP153/MMOP003 Future Major Flare Watch (#8008) * 2007/03/20-- Default CDS/Hinode-EIS co-observations (#7200) Campaign #6850 is for "individual instrument studies" selecting an active region target [partially] influenced by the Max Millennium target selection to maximise chances of serendipitous co-observations. EIT supports all with half/full-res 195 A CME watch in submode 5/6. It is clear that STEREO-EUVI provides adequate "context" information for RHESSI flare observations. Routine EIT submode and resolution switches are probably no longer needed. --> #Hinode-EIS: changes, comments? * Jul 23,30 EIT Shutterless #32, POC: Susanna Parenti The DSN schedule for the shutterless dates is confirmed. EIT Shutterless #32 times as follows: July 23, 2008: DSS-27 19:50-02:30 UT, run-time 21:00-23:50 UT (automation) July 30, 2008 DSS-27 14:40-21:40 UT, run-time 17:00-19:50 UT * Aug 01 Total Solar eclipse (Northern hemisphere), 9:21-11:21 UT, CDS/EIT/LASCO/TRACE/STEREO/Hinode, POC: Serge Koutchmy, Jay Pasachoff, Alphonse Sterling POC: Alan Hale During this eclipse SOHO has just entered the Aug 2008 keyhole period and will not be in contact with ground station until 14:35 UT (3 h 14 min after the end of the eclipse). The observational data from the duration of the eclipse will not be completely down-linked until approximately 17:30 UT. The DSN scheduler will keep an eye on possible additional DSN time during the eclipse. Several expeditions and other ground-based observations of the eclipse have been planned. SOHO-related eclipse web pages including information about the eclipse as well as observations by SOHO instruments and other spacecraft are at http://sohowww.nascom.nasa.gov/soc/eclipse-2008-08-01/. EIT/LASCO eclipse support requests and program details: Alan Hale: C2 C3 white light images at synoptic cadence for possible comet detection in the field of view with STEREO. Serge Koutchmy: totality 10:50-10:52 UT EIT 195A at totality (10:51UT), EIT 4 polarizer sets before (02:12 UT) and after (14:48 UT). C2 full field closest to totality (synoptic cadence) Jay Pasachoff: totality 10:44-10:46 UT EIT 195A at totality (10:45 UT), C2 C3 full field image white light close as possible (synoptic cadence) C2 polarized set prior (09:54 UT), post (11:54 UT) C3 polarized set prior (08:42 UT), post (12:42 UT) EIT 4 wl synoptic set prior (02:12 UT), post (14:48 UT) C2,C3, EIT 195A synoptic program outside of the requested eclipse support. TRACE is observing the eclipse in coordination with Hinode in support of Alphonse Sterling's observations. --> #Hinode: changes, comments? * Sep 24-28 MDI Continuous Contact Note "End-of-pass handling during MDI continuous contact periods" in section 1b. We may do high resolution observations for Helioseismology. Observables will be high resolution magnetograms, dopplergrams and filtergrams at 1-min cadence. FOV is TBD. * Oct 16-20 MDI Continuous Contact Note "End-of-pass handling during MDI continuous contact periods" in section 1b. We may do high resolution observations for Helioseismology. Observables will be high resolution magnetograms, dopplergrams and filtergrams at 1-min cadence. FOV is TBD. * Oct 16, 28 EIT shutterless #33, POC: Susanna Parenti DSN passes (and hence exact times) still TBC. * Nov TBD SUMER/Hinode campaign SUMER says there is no decision yet, but the November campaign is unlikely to happen. --> #Hinode: changes, comments? * Dec 10-14 MDI Continuous Contact Note "End-of-pass handling during MDI continuous contact periods" in section 1b. Standard full disk, 1-min cadence magnetograms and dopplergrams. May do high-resolution helioseismology, particularly if we do not have a 5-day continuous contact in October and there is sufficient interest in MDI doing HR observations (or something really interesting in the MDI HRFOV). * Jan 15, 22 EIT shutterless #34, POC: Susanna Parenti DSN passes (and hence exact times) still TBC. * Jan-Apr (TBD) JOP 214 Quiescent prominence structure and dynamics with Hinode and La Palma, SUMER/Hinode-EIS/Hinode-SOT/Hinode-XRT/DOT/SST, TBC. POC: Tom Berger b) Intercalibration activities Last ICAL was: Jul 16 ICALs are normally performed monthly. Below is a SOC proposal for ICAL weeks for the next six months. * Aug 4-8 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO * Sep 1-5 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO * Oct 6-10 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO * Nov 3-7 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO * Dec 1-5 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO * Jan 5-9 ICAL01 (#7113), CDS/EIT/Hinode-EIS/Hinode-SOT/STEREO Proposed compiled ICAL scheduling criteria, constraints and guidelines (see also campaign #7113): 1) EIT/CDS are the primary participating instruments 2) CDS: Hinode-EIS participation is extremely important and participation is to be attempted within the limitations of the constrained Hinode operations (see "FYI items" in section 3). Hinode-SOT has also expressed interest in participating. 3) STEREO-EUVI observations are included when possible. ICALs are attempted to be scheduled not to coincide with STEREO manoeuvres or other interruptions in observations (see http://stereo-ssc.nascom.nasa.gov/plans.shtml). 4) EIT: ICALs OK at all other times except the weeks of shutterless 5) Dates, details and confirmation will be determined by the planners with support from the SOHO SOCs. CDS okay. If Hinode-EIS can suggest convenient date & time, CDS can usually accommodate. --> #Hinode-EIS, #Hinode-SOT: changes, comments? c) Individual instrument plans MDI: See section 2a for MDI continuous contact periods. MDI may reduce the ALT cadence during Keyholes to be less than 15 ALT magnetograms per day if the lack of high rate telemetry is such that we will lose all or almost all of the 15 ALT Magnetograms each day. The ALT cadence will be decided on an individual Keyhole basis and even a daily basis during each Keyhole depending on the 70 m antenna availability at the time. MDI may also down-link select magnetograms in the 5 kbps telemetry if no 70 m passes are available at least every 2 days for Mag dump in the 160 kbps telemetry. All requests for MDI support need to be made several months ahead of time and sent to mdi-ops(at)mdisas.nascom.nasa.gov. Even outside keyholes, MDI can only do 1-minute cadence observations when we have contact and there is no recorder dump in progress. MDI's REQUEST page is at http://mdisas.nascom.nasa.gov/coordination.txt NOTE: Listing of a study on that page means *only* that a request has been received, not that it will necessarily be supported. A description of MDI Observing Modes most used for JOPs and campaigns (FD vs. HR) can be found at http://mdisas.nascom.nasa.gov/Collaborate. Anyone requesting MDI observations is encouraged to read this page in order to have a better idea of what observing modes would be best suited for a particular study. More detailed information about how MDI operates, observational constraints and telemetry information can be found at http://mdisas.nascom.nasa.gov/MDI_Collaboration_Details. MDI is in Focus 5 for best focus for FD observing. UVCS: For weekly plans, see the SOHO calendar and the UVCS planning page: http://www.cfa.harvard.edu/uvcs/observations/obst.html. --> #UVCS: changes, comments? CDS: For details see http://solar.bnsc.rl.ac.uk/scientificops/request.shtml. EIT/LASCO: EIT: 195 A CME watch plus synoptics at 6-hour cadence, as usual. Full-res CME watch whenever we're in submode 6. Hope never to change until the Bogart mission. SUMER: See section 2a for details. TRACE: NOTE that TRACE in general reserves the right to withdraw support from agreed, existing collaborations if a sufficiently "good active region" is called by the Max Millennium group. For TRACE summer eclipse season see section 1e. 3. Any other business * Tentative SPWG meeting times for next six months (only the next one will be decided in this meeting). Meetings take place as a baseline on Fridays after the daily and weekly meetings. Aug 29 Sep 26 Oct 24 Nov 21 Dec 19 Jan 23 EIT: OK MDI: Aug 29 OK TRACE: OK --> #ALL: changes, comments? The rest are FYI items: * Hinode is currently experiencing technical difficulties that have resulted in a reduction in the rate at which scientific data can be transmitted to the ground from the on-board recorder. According to the Hinode Science Working Group "The problem will have a significant impact on how the Hinode mission is operated." For further details see http://spd.aas.org/SolarNews/archive/news.html#section1. * In the future SOHO's DSN contacts will grow shorter as we lose 26-m antenna support and other, new missions get higher priority. The instrument teams are therefore requested to look at the NRT commanding that is done (especially for emergencies and recoveries) and see what can be converted into TSTOLs that the FOT can run (even without explicit instrument or SOC direction). * MDI high-rate support requests: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html * DSN support requests: preferably at least 6 months in advance. Keep this in mind for: ground-based collaborations that require MDI support, stellar/shutterless observations that require NRT, etc. * Future Mercury and Venus transits: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html * Hinode operational and planning information and guidelines: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html and http://sohowww.nascom.nasa.gov/soc/JOPs/jop-submit.html * STEREO operational and planning information: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html * The SOHO JOP/ICAL database and the web pages are now the Solar JOP/ICAL database and web pages. This is due to anticipated increased contributions by and collaborations as well as intercalibrations with STEREO and Hinode. * New JOP vs. modified existing JOP rules-of-thumb: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html * SOHO calendar email notifications: no change, see URL http://sohowww.nascom.nasa.gov/operations/SPWG/spwg-20080118.html $Log: agenda.txt,v $ Revision 1.13 2008/07/25 13:46:36 tsiili Updated instruments and spacecraft supporting the 1 Aug 2008 Solar eclipse ground-based observations. Revision 1.12 2008/07/25 13:34:20 tsiili Updated dates of Oct 2008 MDI continuous contact period. Revision 1.11 2008/07/24 21:05:26 tsiili Spell-checked the text. Revision 1.10 2008/07/24 21:02:19 tsiili Added Solar eclipse information, removed #STEREO tags. Revision 1.9 2008/07/24 20:26:44 tsiili Removed CDS tags (#CDS) --- no changes. Revision 1.8 2008/07/24 20:25:08 tsiili Removed SUMER tags (#SUMER) --- no changes. Revision 1.7 2008/07/24 20:22:29 tsiili Added TRACE comments by Myers. Revision 1.6 2008/07/24 20:17:27 tsiili Added MDI comments by Gregory. Revision 1.5 2008/07/24 20:04:31 tsiili Added EIT comments by Schenk. Revision 1.4 2008/07/22 21:32:11 tsiili Added entry for JOP 214. Revision 1.3 2008/07/16 20:51:08 tsiili Added the POC to shutterless' numbers 33 and 34. Revision 1.2 2008/07/16 20:45:26 tsiili First published draft. Noteworthy changes include: Aug 2008 manoeuvre dates, D45 & D65 uplink status, Jan 2009 ICAL and SPWG date suggestions, inclusion of Hinode-SOT (tentatively) to ICALs. Revision 1.1.1.1 2008/07/16 17:49:02 tsiili Importing draft for SPWG meeting on 20080725