Summary of Status Meeting 10-Mar-1996 (Notes taken by SUMER) Meeting chaired by D.Zarro 1. FOT Status 1.1 S/C nominal. 1.2 DSN Some DSN trouble. Yesterday we unrecoverably lost data from 16:57 to 17:08 UT during station hand-over. A transmitter problem prevented the second hand-over to occur on time. NRT interruptions occurred as well, but no data were lost. 2. Experiment status GOLF: Nominal. MDI: Nominal. High cadence velocity study performed. SUMER: Nominal. Scheduled network study did not run, because of the unexpected NRT interruption mentioned above. Long-term limb observation (movie). CDS: Nominal. Pointing test and spectral atlas at Sun centre. UVCS: Nominal. Pointing test could not be performed, because of the NRT interruption. Coronal hole observation. EIT/LASCO Nominal. Perform synoptic observations. The other experiments were not represented at the meeting. 3. Modifications to today's schedule None. It was requested to give one hour notice of NRT interruptions, if possible. 4. Tomorrow's plan As issued by SOC. 5. Open issues The L1 correction of the pointing tool will be available next week. 6. AoB None