5 September 1997 Daily Meeting Minutes -------------------------------------- FOT Briefing ------------- S/C Status is Nominal. Spacecraft Anomalies: 247/1553 Star 1 False Event. No longer being tracked. Accomplished Activities: RSL, VIRGO, SWAN, COMS Backup Recovery, RW4/MM/SK Planned Activities: RSL, VIRGO, CELIAS (16:30, 00:45) Upcoming operations: 10/1 -- Tape Recorder Maintence/Memory Dumps Ground Anomalies 247/1105 -- 30 Min Cmd Delay D66 Attempting to Lock RCVR 1 247/1450 -- 23 Min Cmd Delay D16 Attempting to Lock RCVR 1 247/1702 -- POCC Prime String Crash (CPU-b) 248/0010 -- TM Dropout 30 sec D27 Loss of Clock Signal on Line SOLAR STATUS: ------------- Tiny active region in the South with some sunspots around it. MDI may be able to support Tenerife campaign a little bit on Saturday. Cannot support on Sunday due to change in DSN schedule. Instrument Status ----------------- CDS: Nominal Friday: Door closed, resume observing at 02:00 on Saturday. Saturday: Requested sunspot observations. Flows in active regions loops. North Coronal Hole study. Sunday: Flows in active regions loops. North Coronal Hole study. Synoptic study. SUMER: Nominal. Today: SUMER opens the doors. Tomorrow SUMER starts Tenerife campaign. Coronal Hole boundary observations. Reference spectrum of West active region. Sunday: same program. UVCS: Nominal. Yesterday off for momentum management. This night off as the available NRT to resume operations was only 10 m. Today UVCS observe N Coronal Hole at 2.5 Ro to get solar wind speed. Tomorrow: UVCS start JOP68 looking at 1.5 Ro for 3h 30m and next at 1.7 Ro for 6h. Sunday: UVCS continues JOP68 looking at 2.5 Ro for 9h 20m. The same the following day. LASCO: Nominal. Yesterday: Door closed. Today: LASCO resumes observations. Continue synoptic observations and support for JOP68 EIT: Nominal MDI: Nominal. High resolution study until jitter test. Full disk magnetograms except on Sunday morning. MDI Will run high resolution campaign for Tenerife/SUMER quiet Sun study. MDI will use right half of high res FOV (10 arcmin N-S, 5 arcmin E-W). SWAN: some problems with wrong delayed command file being sent. (note: after the meeting it was discovered that although 2 files were sent, the correct file was uplinked last, overwriting the previous one and the desired observations occurred.)