25 February 1998 SOHO Daily Meeting Minutes Announcements ------------- Daily meeting will be at * 10:30 AM * tomorrow, due to media activity in the EOF. FOT Briefing ------------ Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: RSL, VIRGO, SWAN Planned Activities: RSL, VIRGO Upcoming Operations: 26 Feb - Extra VC2 during Eclipse support (1800-1900) 02 Mar - S/W Patch of TM Subformat 3 Ground Anomalies: 055/2002 - TC Block Sequence Error during UVCS NRT (28 min NRT pause) 056/0007 - TM Dropout; JPL to GSFC comm line down (12 min, recoverable) 056/0436 - Degraded data; JPL Comm misconfig (3 min, recoverable) 056/0710 - D61 incorrectly swept RCVR1 twice (6 min delay) 056/0806 - TM Dropout; D61 equipment problem (2 min, recoverable) INSTRUMENT STATUS ----------------- CDS: Nominal. Today and tomorrow: eclipse support and limb studies. SUMER: Nominal. Yesterday: JOP018 and Quiet Sun velocity program (which is finished). Today: coronal diagnostics program at S. coronal hole. UVCS: Nominal. Yesterday: SW limb study with Galileo. Today: SW limb instead of normal synoptic. Tomorrow: eclipse support in visible light channel. LASCO: Nominal. Continuing synoptic program. Tomorrow: 12 hours of eclipse support, concentrating on polarized-brightness studies in all 3 telescopes. EIT: Nominal. Yesterday: VLA support (VLA had bad weather and shut down early) and JOP018. Today: normal CME Watch. Tomorrow: eclipse support. MDI: Nominal. Continuing continuous dynamics program.