SOHO Daily Meeting Minutes for 14 Dec. 1998 Chaired by: J. Hollis (SOC) Notes by: E. Zamkoff (MDI) DOY: 348 FOT Daily Briefing ----------------- Spacecraft Status: Nominal Spacecraft Anomalies: 348/0638 CEPAC ESU Data Request Error. Accomplished Activities: Day 345: RSL,VIRGO,SWAN,New Guide Star (mag 7, slot 2) Day 346: VIRGO Day 347: VIRGO,NONCOHO Planned Activities: VIRGO, SWAN,CELIAS Upcoming Operations: 12/21 - Momentum Management, Station Keeping Maneuver Ground Anomalies: 345/1632 TC Block Sequence Errors. D16. One command failed to reach station and be uplinked. 6 commands rejected. 345/1756 16 Min degraded TM. D16. RFI. 16 min NRT pause 346/0625 Commands not reaching station. D46. Reason unkown. 5 min commanding delay. 346/1432 45 Min commanding delay. D16. CPU crash and power outage. SSR in record so no TM loss. 347/2150 1.5 min commanding delay. D24. Command lost between Pocc and Station. JPL error. 348/0710 1.5 min Late AOS. D61. Antenna masked until 071130. SOLAR STATUS ------------ The 2 regions in the south are growing and have M class flare potential. Lots of streamers this weekend but little activity. Filaments in NE and SE. On Saturday there was a small CME in NE and a N pole jet. Today is heavy CME from the S/SW and CME from NW limb. INSTRUMENT STATUS ----------------- CDS: Nominal. Weekend: AR studies, engineering, explosive events study. Today: NEAR collaboration looking for CME's, AR studies, filament studies. UVCS: Nominal. CME watch at E limb then synoptic. LASCO: Nominal. C2/C3 synoptic, C1 FP testing. EIT: Nominal. 195 CME watch in full res. MDI: Nominal. Continuing AR study with Sac Peak looking at the southern hemisphere in all 3 variables.