SOHO Daily Meeting Minutes for Friday, 15 March 2002
ANNOUNCEMENTS
-------------
* HESSI target for today: AR 9866
* PEPCO will perform Preventive Maintenance on a GSFC feeder
from March 16 at 5:00 am until March 17 at 6:00 pm. There
should be no impact, however as with any outage there is the
possibility of power glitches.
* There will be a power outage for maintenance work in building
21 on Saturday March 16.
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: 073/1814 BDR 1 on Battery 1 status OFF.
Accomplished Activities: VIRGO, NOM HGA
Planned Activities: RSL, VIRGO, SWAN, TTMH_TOMM_MMTOMH_02074
Upcoming Operations: None
Ground Anomalies:
073/1638 Wayward command. 8 commands retransmitted. 6 min NRT pause.
SOLAR STATUS
------------
03/14 DOY 073 - 03/15 DOY 074
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020315.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. JOP118 on AR 9866 continuing through the weekend.
In addition to weekend studies CDS plans a flare watch on
AR 9871 Saturday.
UVCS: Nominal. Coronal hole observations in the north and long synoptic
today. Saturday and Sunday - 10 hours each day of coronal hole
observations in the south west with synoptic.
LASCO: Nominal. C2/C3 synoptics.
EIT: Nominal. 195 Angstrom CME watch and synoptics.
MDI: Nominal. Full disk magnetograms and dopplergrams.
TRACE: Nominal. Tracking AR 9866 in 171A and supporting JOP118 continues
through the weekend.