SOHO Daily Meeting Minutes for Tuesday, 7 May 2002 ANNOUNCEMENTS ------------- * RHESSI target for today is AR 9934; target for tomorrow is AR 9934. * JOP104 target for today is AR 9919, 9926 (and 9930); target for tomorrow is the same. * PMI has been scheduled to perform corrective maintenance on PDU-D16 on May 7 from approx. 10:30 am until 2:30 pm. This unit is one of two PDU's that feed the ISTP areas in building 3 rooms C130, C150, C156 and C160. All equipment on this PDU must be shut down and powered off prior to the maintenance start time. THERE WILL BE NO COMMANDING OR TELEMETRY IN THE EOF DURING THIS TIME. ALL DATA WILL BE RECOVERABLE. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 126/1933 VIRGO sensors SPM-A and SPM-B latched-up for 30 minutes. Impacts TBD. Accomplished Activities: VIRGO Planned Activities: VIRGO, CELIAS, RSL Upcoming Operations: None Ground Anomalies: 126/1605 Low SPE value received during D27 support using RCVR 2. Problem cleared following a second carrier sweep. Commanding activities delayed 23 minutes. 126/1607 Lost 16 minutes 6 seconds of recoverable TLM, and 14 minutes of potential MDI high rate data, due to a SCP failure at Goldstone. 126/2207 Command corrupted bewtween D27 antenna and the spacecraft. Commanding activities (includig NRT) delayed 6 minutes 15 seconds. 127/0847 CMA failure resulted in commanding activities being delayed 14 minutes. SOLAR STATUS ------------ 05/06 DOY 126 - 05/07 DOY 127 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20020507.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm INSTRUMENT STATUS ----------------- CDS: Nominal. JOP104, sunspot oscillation study on AR9934, engineering. Tomorrow: JOP136, engineering, and either sunspot oscillations study or active region maps. SUMER: Nominal. JOP104 continues. UVCS: Nominal. Coronal hole observations and mini-synoptic. Tomorrow: coronal hole observations and synoptic. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. Half-resolution 195 CME watch and synoptic. MDI: Nominal. Full disk magnetograms and dopplergrams for continuous contact. TRACE: Nominal. Observing the RHESSI target in 195A.