SOHO Daily Meeting Minutes for Friday, 29 March 2002 ANNOUNCEMENTS ------------- * HESSI target for today is AR 9880, tomorrow's target is AR 9880 * There will be maintenance work done on sohoftp.nascom.nasa.gov starting this morning. Very likely, this will produce some service outages. It is expected to be back to normal before Monday morning, April 1. * PMI contractors are scheduled to perform preventive maintenance on the 3UPS-20 today from 9:00 am until 4:30 pm. The UPS unit will be in bypass and the load will be on commercial power during this activity. No impact to operations is expected. 3UPS-20 supports SOHO, W/P, and XTE missions. * Goddard phone voice mail will be down on Saturday from 6am-noon. If you need to leave a message for the SOC at this time, send email and try calling back after noon. * HESSI observing times website for planning purposes: ftp://hessi.ssl.berkeley.edu/pub/saa_ecl/hessi_observation_times FOT REPORT ---------- Spacecraft Status: Nominal, SUMER OFF Spacecraft Anomalies: None Accomplished Activities: VIRGO, SWAN, NOM HGA Table Planned Activities: VIRGO, RSL Upcoming Operations: None Ground Anomalies: 088/0057 - TM/TC Dropout;; D46 Power Outage (9 minute TM loss, unrecoverable; 50 minute TC loss) 088/0740 - Late AOS; D65 receiver reboot (3 minute, covered by D34) SOLAR STATUS ------------ 03/28 DOY 087 - 03/29 DOY 088 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20020329.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm INSTRUMENT STATUS ----------------- CDS: Nominal. AR studies on AR9880 then sunspot studies on AR9878. Weekend: usual weekend studies and CME onset pointing at AR 9880 on Sunday. UVCS: Nominal. Coronal hole/streamer interface study and mini-synoptic. Weekend: HESSI support on AR9880 and mini-synoptic. LASCO: Nominal. C2/C3 synoptics, high cadence pB sequences during the EIT bakeout. EIT: Nominal. 195 Angstrom CME watch and synoptics. Bakeout begins at 23 UT Friday. MDI: Nominal. Full disk magnetograms and dopplergrams for continuous contact. TRACE: Nominal. Observe AR 9878 and full disk mosaic during EIT bakeout.