SOHO Daily Meeting Minutes for Wednesday, 7 August 2002
ANNOUNCEMENTS
-------------
* RHESSI and High Cadence AR Study target for today is AR 0057;
target for tomorrow is TBD.
* Router maintenance work is happening now.
* The IPNOC needs to perform emergency maintenance on both TLAN routers
that will result in a complete outage. The planned time frame is
Wednesday 8/7/02 from 10AM to 11AM. This will effect the SOHO,
WIND/POLAR, XTE, ACE, TRMM, SOTA, TSM, and ICE missions.
* PMI contractors are scheduled to perform preventive maintenance
on the UPS-15 system on August 9 from 8:30AM until 4:30PM. The
UPS system will be in bypass and the load will be on commercial
power during this activity. No impact to operations is expected.
3-UPS-15 supports SOHO, WIND/POLAR and XTE missions.
* Security scans in FOT area on Thursday morning. This will create
pauses in NRT during the morning.
* Security scans in the EOF and EAF on Tuesday 13 August at 12 UT.
FOT REPORT
----------
Spacecraft status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: New Guide Star, RSL, VIRGO, New Tracking Star
Planned Activities: VIRGO
Upcoming Operations: None
Ground Anomalies: None
SOLAR STATUS
------------
08/06 DOY 218 - 08/07 DOY 219
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020807.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. High Cadence AR Study and HIDA collaboration on AR0061.
Tomorrow: High Cadence AR Study, HIDA collaboration, and post-CME
dimming watch
UVCS: Nominal. Coronal hole study and long synoptic. Tomorrow: RHESSI
support and mini-synoptic.
LASCO: Nominal. C2/C3 synoptics and hourly C2 pB images, JOP159.
EIT: Nominal. 195 CME watch and synoptic.
MDI: Nominal. Full disk magnetograms and dopplergrams.
TRACE: Nominal. High Cadence AR Study.