SOHO Daily Meeting Minutes for Thursday 6 February 2003
ANNOUNCEMENTS
-------------
* Current RHESSI default target is AR 10276
* In case of heavy snow tomorrow, the EOF office may not be staffed.
Call the SOCs at home if needed and the SOCs will be checking email
from home.
* Commanding times for next week:
Monday - D66 until 19 UT then D27.
Tuesday - D54 until 19 UT then D27.
Wednesday - D66 until 19 UT then gap until 23 UT on D27.
Thursday - D/L only station until 16:30 UT then good commanding.
Friday - D66 until 19 UT then D/L only station until 23 UT.
Saturday - D66 until 19 UT then D27.
Sunday - D66 until 16:30 UT then D27.
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: VIRGO, SWAN
Planned Activities: NOM HGA, VIRGO, CELIAS
Upcoming Operations: 2/25 SK/MM Maneuvers
Ground Anomalies:
036/1942 7.5 min TM dropout. D15. Antenna went to brake. 4 min recoverable
from SSR.
036/2340 17 minute TM dropout. D27. SCP Failure. Last 15 minutes
recoverable from CDR.
SOLAR STATUS
------------
02/05 DOY 036 - 02/06 DOY 037
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20030206.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. ICAL01, engineering/monitoring studies, transition
region lines in ARs, test of JOP 164 studies. Tomorrow: EUV
intensities in ARs, engineering.
UVCS: Nominal. Streamer properties study and synoptic.
LASCO: Nominal. C2 and C3 synoptics.
EIT: Nominal. 195 CME watch and synoptics, ICAL01.
MDI: Nominal. Full disk and high resolution dopplergrams for
continuous contact.
TRACE: Nominal. Observing AR10276 for today and tomorrow.