SOHO Daily Meeting Minutes for Friday 24 September 2004 ANNOUNCEMENTS ------------- * We had some problems with our ftp system for delayed/background loads the last few days, but this has now been fixed. If, however, you are still unable to send your loads, send them to the SOCs by email. If you have an urgent/weekend load, contact the SOCs by phone to make sure it is being processed. * The patch works and we will begin using it from now on. This means that future recording intervals previously announced in the schedule at http://soho.nascom.nasa.gov/soc/keyhole.sep04 will NOT be executed. GOLF and VIRGO should get continuous data from now on. * The current RHESSI default target is AR10673. When selecting this target to maximize coordination w/others, use campaign number 6850. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Uplink delayed load: KEYHOLE_04268 Planned Activities: SWAN, VIRGO, RSL, Begin Intermittent Recording in gaps (pending CCB approval) Upcoming Operations: HGA Keyhole (11 Sep - 5 Oct) Ground Anomalies: 267/1315 - Degraded data from D54; Cause unknown (215 minutes) Other: SSR completely dumped as of 266/1649. Oldest data on TR: 266/0345 SOLAR STATUS ------------ 09/23 DOY 267 - 09/24 DOY 268 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20040924.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Keyhole operations/engineering. UVCS: Nominal. In a safe configuration for the keyhole. LASCO: Nominal. C2/C3 pB CME study. EIT: Nominal. Bakeout. MDI: Nominal. 96 minute magnetograms downlinked in the 5k data stream. TRACE: Nominal. Full disk mosaics, observing AR10673.