SOHO Daily Meeting Minutes for Wednesday 22 December 2004 ANNOUNCEMENTS ------------- * Weekly meeting tomorrow after the Daily meeting * The current RHESSI default target is AR10713. When selecting this target to maximize coordination w/others, use campaign number 6850. * EOF network maintenance planned for tomorrow will be rescheduled. * Friday is a holiday. There will be someone in the SOC office from 15-19 UT. * Saturday is a holiday. There will be someone in the SOC office from 18 UT until 00 UT the following day. FOT REPORT ---------- Spacecraft Status: Nominal Keyhole Configuration (Inverted Roll position) Spacecraft Anomalies: None Accomplished Activities: 20 Dec - CELIAS, MDI, Intermittent record timetag loads 21 Dec - SK/MM/180 deg Roll maneuvers, Intermittent record timetag loads Planned Activities: None; 20 hour gap in coverage (Nominal daily activities completed earlier) Upcoming Operations: 13-29 Dec - HGA keyhole operations Ground Anomalies: 356/0846 - Duplicate command at D54; Cause unknown 356/1836 - Duplicate command at D24; Cause unknown 356/2136 - Duplicate command at D27; Cause unknown 356/2208 - Lost/Degraded TM; RFI at D14 (2 minutes lost, unrecoverable; 67 minutes degraded, unrecoverable) 357/0844 - Degraded TM from D54; Both data channels on-line simultaneously (86 minutes, recoverable from CDR) SOLAR STATUS ------------ 12/21 DOY 356 - 12/22 DOY 357 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20041222.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Safed for maneuvers. Recovery on Thursday. UVCS: Nominal. In a safe configuration for the keyhole. LASCO: Nominal. Safed for maneuvers. Recovery on Thursday. EIT: Nominal. Bakeout for the keyhole. MDI: Nominal. 3 ALT magnetograms per day at 00, 08, 16 UT. When VC2 is available, taking full disk magnetograms and continuum. TRACE: Nominal. Full disk mosaics, observing AR10713. On Thursday, TRACE will be loading through Tuesday.