SOHO Daily Meeting Minutes for Monday, 18 June 2001 ANNOUNCEMENTS ------------- * Umbra will be down for part of Monday afternoon. * Security scans did not take place today. They will be rescheduled. * There were remote network problems on Saturday until about 23 UT, so if anyone saw a problem, this was the cause. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: DOY 166: VIRGO, SWAN, RSL DOY 167: VIRGO DOY 168: VIRGO, Noncoho Load, Flight S/W Maint. Planned Activities: VIRGO, SWAN Upcoming Operations: June 28 Momentum Management/SK Maneuvers Ground Anomalies: 166/2115 Wayward command delayed NRT activities 12 minutes as 9 commands had to be retransmitted. 167/0423 CPA failure at D54 delayed commanding activities 24 minutes. Lost 28 minutes of potential range data. SOLAR STATUS ------------ 06/15 DOY 166 - 06/18 DOY 169 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20010618.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/2001/obs20010618.html INSTRUMENT STATUS ----------------- CDS: Nominal. JOP142, active region observations with TRACE. Tomorrow: JOP142. UVCS: Nominal. 24-hour synoptic. Tomorrow: white light channel characterization and synoptics. LASCO: Nominal. Increased cadence white light sequences and pB sequences until 18 UT today, then the usual C2/C3 synoptics and JOP139 observations. EIT: Nominal. Bakeout until this afternoon, then calibrations before resuming 195 CME watch. Tomorrow EIT will do 304 Angstrom images at a 75-second cadence from 16 to 17 UT in support of JOP142. MDI: Nominal. Line profiles and high res observations. Tomorrow: high res observations continue. Supporting JOP142 both days. TRACE: Nominal. JOP142, active region studies, supporting MDI high res studies.