SOHO Daily Meeting Minutes for Friday, 29 August 2003 ANNOUNCEMENTS ------------- * Current RHESSI default target is AR10449. When selecting this target to maximize coordination w/others, use campaign number 6850. FOT REPORT ---------- Spacecraft Status: Nominal: Inverted roll position HGA position monitoring disabled Spacecraft Anomalies: None Accomplished Activities: SWAN Nom HGA Table (Y-axis only) New tracking star (7.4 mag) Timetag load (SSR to record at end of downlink-only pass) Planned Activities: RSL, VIRGO Upcoming Operations: Sep 2 - LR TM Test on 26m station (D16) Sep 2 - ACU/CDMU Memory Dumps Ground Anomalies: 240/1613 - Loss of Voice Circuit to JPL Comm, D16, and D66; Goddard Voice inadvertently disconnected circuit (9 min delay in station handover activities) 240/2104 - TM Dropout; TCP hung up at D16 (8 mins, unrecoverable) SOLAR STATUS ------------ 08/28 DOY 240 - 08/29 DOY 241 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20030829.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. JOP169, Oslo Sunspot Study, and Oslo AR Loops with NIS/GIS. CPT testing will be performed during a two-hour gap in science, starting 4pm local (20-22 UT). Weekend: JOP 169 and Off Limb Coronal Study on Saturday. Off Limb Coronal Study and CME Onset study on Sunday. UVCS: Nominal. Detector calibrations and synoptic. Weekend: South Coronal Hole observations and synoptics. LASCO: Nominal. C2/C3 observations and Venus campaign. Weekend: C2/C3 observations. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and dopplergrams with continuous contact through Monday. TRACE: Nominal. JOP169 support on west limb and observations of AR10442.