SOHO Daily Meeting Minutes for Tuesday 09 March 2004 ANNOUNCEMENTS ------------- * The current RHESSI default target is AR10570. When selecting this target to maximize coordination w/others, use campaign number 6850. * Tuesday through Thursday parking availability anywhere close to Building 26 will be very limited due to the SDO PDR. * ICAL01 today at 20 UT. * Solar Science Seminar Wednesday, March 10, at 3:30 PM, Bldg. 26, Rm. G-10. Mike Marsh (U.Central Lancashire) will speak on "Propagating Oscillations Within Active Region Loops -- Coordinated Observations with SOHO/CDS and TRACE" FOT REPORT ---------- Spacecraft Anomalies: None Accomplished Activities: SWAN Planned Activities: CELIAS, RSL Upcoming Operations: Keyhole Operations begin 3/19 Ground Anomalies: None Other: None SOLAR STATUS ------------ 03/08 DOY 068 - 03/09 DOY 069 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20040309.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Loop variability study, NIS spectral atlas, ICAL01. Tomorrow: loop variability study, engineering. UVCS: Nominal. Coronal hole observations and synoptic. Tomorrow: streamer study and synoptic. LASCO: Nominal. C2/C3 synoptics. Tomorrow: C2/C3 synoptics and JOP159. EIT: Nominal. 195 CME watch, synoptics, ICAL01. Tomorrow: 195 CME watch and JOP159. MDI: Nominal. Full disk magnetograms and dopplergrams, supporting the quasi-steady coronal loops study. TRACE: Nominal. Loop variability study and quasi-steady coronal loops study.