SOHO Daily Meeting Minutes for Friday 28 October 2005 Prepared by: NASA SOC's ANNOUNCEMENTS ------------- * The current RHESSI default target is the unnumbered region that at 06:30 UT on 28 October was S10W22 (Solar X = 358", Solar Y = -264"). When selecting this target to maximize coordination w/others, use campaign number 6850. * Daylight Saving Time ends at 1 UT (Europe) and 6 UT (US) on Sunday, then GSFC local = UT-5 hours = Central Europe-6 hours * The PDU-15 switch-off will be on Monday 31 October at 12 UT. * The PDU-16 replacement tentative dates are a test on 17 November at 9am and the replacement on 29 November at 7am. If anyone has a problem with these dates, please let the SOC know. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Nominal daily activities, Uplink delayed load: CELIAS, HGA Table Planned Activities: Nominal daily activities, Uplink delayed loads: VIRGO, SWAN, RSL Table, Acquire new tracking star Upcoming Operations: None Ground Anomalies: 300/1355 Delayed commanding due to search left on (DSS27) - delayed commanding for 16 minutes and delayed switch to VC2 by 5 minutes. INSTRUMENT STATUS ----------------- CDS: Nominal. JOP171 (#7160) for today and the weekend. UVCS: Nominal. Suprathermal seed particle population measurements study. LASCO: Nominal. C2/C3 synoptics, JOP159. EIT: Nominal. 195 CME watch and synoptics, spectroscopy and imaging tomography of solar fibrils study (#7161), JOP159. MDI: Nominal. High Resolution observations, JOP171 (#7160), spectroscopy and imaging tomography of solar fibrils study (#7161). TRACE: Nominal. Engineering, JOP171 (#7160).