SOHO Daily Meeting Minutes for Monday 27 February 2006 (DOY058) Prepared by: Gini Heilman ANNOUNCEMENTS ------------- * The current RHESSI default target is the small AR at S09E86. When selecting this target to maximize coordination with others, use campaign number 6850. * Tomorrow: Submode Change to Submode 5, 18:55 UT Transponder swap on D24 EIT Bakeout begins 34m Keyhole begins * SORR meeting on Friday for Manuevers on Tuesday. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 055/2058 CEPAC ESU data request error Accomplished Activities: 055 - RSL, VIRGO, SWAN, keyhole loads 056 - Nominal activities, keyhole loads 057 - Nominal activities, keyhole loads Planned Activities: New tracking star, keyhole loads Upcoming Operations: Keyhole 22 Feb - 21 Mar SK/MM 7 Mar Roll maneuver 15 Mar Ground Anomalies: 055/2004 13 min NRT interruption, CMS-EOF socket connection lost 056/0440 D34 134 min late AOS, no data lost, 100 min VGM, high rate LAN problem INSTRUMENT STATUS ----------------- CDS: Nominal. Today and tomorrow: CME onset watch at the west limb. Wednesday synoptic observations. UVCS: Nominal. Support JOP175 (#7135) and then Safe configuration for the keyhole. LASCO: Nominal. C2/C3 synoptics, JOP175 (#7135). EIT: Nominal. JOP175 (#7135), 195 CME watch and synoptics. Tomorrow: bakeout begins. MDI: Nominal. Full disk magnetograms and dopplergrams with 96 minute alt cadence today and tomorrow. TRACE: Nominal. JOP175 (#7135) and then Annealing begins. Questions, corrections, and updates: soc@soc.nascom.nasa.gov