SOHO Daily Meeting Minutes for Monday 27 March 2006 (DOY 086) Prepared by: Emily Zamkoff ANNOUNCEMENTS ------------- * The current RHESSI default target is the east limb AR. When selecting this target to maximize coordination with others, use campaign number 6850. * Eclipse web page is at: http://sohowww.nascom.nasa.gov/soc/eclipse-2006-03-29/ FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 085/1713 (3/26) Lost star in slot 1 - no star in slot 1 several hours Accomplished Activities: DOY 083 Nominal Daily Activities, Uplink delayed load: VIRGO, Uplink loads: TTD45_06083, TTD46_06083, RSL Table, Acquired new tracking star, Referenced C-06: CDS MCP Voltage Alarm, Executed CS-14 & CS-21 DOY 084 Uplink delayed load: SWAN, Uplink load: TTD46_06084, Nominal Daily Activities DOY 085 Nominal Daily Activities, Executed CS-28 Planned Activities: Nominal Daily Activities, Reacquire star 1 (CS-28) Upcoming Operations: None Ground Anomalies: 084/0030 (3/25) Loss of telemetry due to station power outage - lost 18.6 minutes of telemetry (includes VC2) - nonrecoverable. Other: SSR is completely dumped as of 1400 UTC. INSTRUMENT STATUS ----------------- CDS: Nominal. Quiet sun variability study at sun centre. Tomorrow: centre-to-limb spectral scan, synoptic/engineering studies. SUMER: Nominal. Switching to detector B. Tomorrow: coronal hole observations. UVCS: Nominal. Observations in support of the eclipse. LASCO: Nominal. C2/C3 synoptics, JOP175 (#7135). EIT: Nominal. Half resolution 304 CME watch, synoptics, and 171 at 3 hour cadence for eclipse support, JOP175 (#7135). MDI: Nominal. Full disk magnetograms and Dopplergrams for continuous contact. TRACE: Nominal. Engineering and cals, test program for eclipse, Sac Peak observations. Questions, corrections, and updates: soc@soc.nascom.nasa.gov