SOHO Daily Meeting Minutes for Thursday 15 June 2006 (DOY 166) Prepared by: Gini Heilman ANNOUNCEMENTS ------------- * The current RHESSI default target is on the following webpage: http://solar.physics.montana.edu/hypermail/mmmotd/. When selecting this target to maximize coordination with others, use campaign number 6850. * EIT Bakeout ends today * For the DSN outlook for next week, see the graphical DSN schedule at: http://sohowww.nascom.nasa.gov/soc/dsn/04.html FOT REPORT ---------- Spacecraft Status: Nominal, Inverted Roll Position Spacecraft Anomalies: None Accomplished Activities: Nominal Daily Activities Uplink keyhole loads Keyhole operations 27 May - 14 Jun Planned Activities: Nominal Daily Activities Loads: SWAN, CELIAS Upcoming Operations: None Ground Anomalies: 166/0630 Telemetry and commanding outage (DSS66) due to station timing system. 12.8 minutes intermittent data loss (recoverable), 10.8 minutes intermittent data loss (non-recoverable), 56 minutes delayed commanding, 19 minutes loss of commanding. - DR# M103735. Other: Last SSR dump 166/0730 (DSS66) INSTRUMENT STATUS ----------------- CDS: Nominal. Network Variability and Dynamics study. Tomorrow: Quiescent AR Loop Dynamics study on a small unnamed sunspot group west of the solar meridian. UVCS: Nominal. Star Observations and Helium Focusing Cone Observations. Tomorrow: Star Observations, Ulysses quadrature observations (#7183). LASCO: Nominal. C2/C3 synoptics, C2pB observations for tomography reconstruction, Ulysses quadrature observations (#7183). EIT: Nominal. Bakeout ends today, post bakeout calibrations. MDI: Nominal. Full disk magnetograms and Dopplergrams when high rate is available. TRACE: Nominal. Full disk mosaics, La Palma coordination, observing AR10892. Questions, corrections, and updates: soc@soc.nascom.nasa.gov