SOHO Daily Meeting Minutes for Tuesday 29 July 2008 (DOY 211) Prepared by: Gavin Westenburger ANNOUNCEMENTS ------------- * Possible RFI at Canberra through 3 August, 2008. * The delayed command load submission system on the ECS computers is still not working. Please submit all loads via email to soc@soc.nascom.nasa.gov. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml * EIT shutterless tomorrow so NRT will be limited. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Nominal activities Planned Activities: RSL, new guide star, TR ON, TR maintenance Upcoming Operations: Keyhole Operations 1-31 Aug Ground Anomalies: None Nighttime NRT for Today and Tomorrow: During all passes between 0000 - 1130 UT, with some short pauses. INSTRUMENT STATUS ----------------- CDS: Nominal. Polar coronal hole tornado study, blinker study, GIS meridian study. UVCS: Nominal. Observations of polar coronal holes. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and Dopplergrams. TRACE: Nominal. Observing disk center with Hinode, observing a bright point near disk center with RHESSI. Questions, corrections, and updates: soc@soc.nascom.nasa.gov