SOHO Daily Meeting Minutes for Monday 18 May 2009 (DOY 138) Prepared by: Gavin Westenburger ANNOUNCEMENTS ------------- * We have made some changes to the SOC configuration files. If you have any problems with your connections, please let us know. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: 135 (5/15) - RSL, VIRGO, UVCS recovery continued 136 (5/16) - 26-meter keyhole configuration end, TR OFF 137 (5/17) - Nominal activities Planned Activities: Nominal activities (start of MDI continuous) Upcoming Operations: MDI continuous (18 May - 21 Jul) Ground Anomalies: 138/0314 (5/18) - D46 9 minute TM interruption (recoverable), 56 minute CMD loss, transmitter tripped 138/0925 (5/18) - D65 111 minute late TM in POCC. Problem at JPL COMM. Nighttime NRT for Today and Tomorrow: See FTP'd activity plan INSTRUMENT STATUS ----------------- CDS: Nominal. AR diagnostics with EIS, AR flare diagnostics. UVCS: Nominal. Coronal fluctuations in solar wind acceleration regions. LASCO: Nominal. C2/C3 synoptics, C2pB for tomography reconstruction. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk Dopplergrams and continuum images, calibrations today. TRACE: Nominal. Going into hibernation. Minimal science. Questions, corrections, and updates: soc@esa.nascom.nasa.gov