WEEKLY MEETING MINUTES Week 25, June 18-24, 2001 1. Announcements ---------------- * SOHO SSR will be used for 5 hours (10-15 UT) during the June 21 solar eclipse and 1 hour (17:30-18:30 UT) for the TXI rocket launch. * HESSI is scheduled for launch June 21 at 09 UT. 2. Operations Constraints ------------------------- * EIT bakeout ends and observations resume late Monday/early Tuesday. * Commanding schedule for next week: Monday - Command on DSS27 all day or after 00:00 UT Tuesday. Tuesday - Command before 14 UT or on DSS27. Wednesday - Command before 19 UT, after 23 UT, or on DSS27 in between. Thursday - Command before 14 UT, after 20 UT, or on DSS27 in between. Friday - Commanding is good all day. Saturday - Command before 16 UT, after 21 UT, or on DSS27 in between. Sunday - Commanding is good all day. NOTE: No commanding is available from 14-15 UT any day. CAUTION: Commanding on DSS27 is not recommended. 3. Coordinated Observations --------------------------- M Jun 18 (W 25) EIT Bakeout ends (late) JOP142 Motions in Filaments (#6764), TRACE/CDS/MDI/Sac Peak, (Sac Peak: 13-24 UT; Prime observing time: 13-18 UT) POC: Terry Kucera T Jun 19 JOP142 Motions in Filaments (#6764), TRACE/CDS/MDI/Sac Peak, (Sac Peak: 13-24 UT; Prime observing time: 13-18 UT) POC: Terry Kucera W Jun 20 Backup TXI launch day JOP142 Motions in Filaments (#6764), TRACE/CDS/MDI/Sac Peak, (Sac Peak: 13-24 UT; Prime observing time: 13-18 UT) POC: Terry Kucera T Jun 21 Solar eclipse HESSI launch, http://hessi.ssl.berkeley.edu/about/status.html Coordinated Observations for Solar Eclipse (#6766), EIT/LASCO/CDS/GBOs, POC: Gareth Lawrence JOP123 Narrow band photometry of EUV emission lines (#6767), CDS/EIT/TRACE/TXI, POC: Ed Deluca. Launch at 17:30 UT. F Jun 22 S Jun 23 S Jun 24 Other activities for Week 25: * Jun 18-24 UVCS Characterization of White Light Channel Submodes: Submode 6 all week Planners for Week: CDS -- Terry Kucera MDI -- Sarah Gregory EIT -- Jeff Newmark SUMER -- Not observing LASCO -- Ops Team UVCS -- Marco Romoli TRACE -- Kathy Reeves Relevant Notes -------------- CDS: Monday through Wednesday - JOP142; Wednesday also begin solar eclipse support. Thursday - solar eclipse support and JOP123 support for TXI rocket flight. Friday CDS will do a full sun full spectrum scan. Saturday and Sunday CDS will do the usual weekend studies with a CME watch. UVCS: White light characterization and eclipse day support. LASCO: Monday continues the high cadence white light sequences. After EIT bakeout is finished, standard C2/C3 synoptics will start. Supporting eclipse and JOP123 on Thursday. EIT: Bakeout ends Monday, then EIT resumes its 195 CME watch and synoptics late Monday/early Tuesday. Thursday EIT will support JOP123 and solar eclipse observations. MDI: Line profiles in high res field on Monday, then high res campaign through Wednesday. Switching to full disk for eclipse and rocket support. TRACE: JOP142, eclipse and rocket launch (195 only campaign).