next up previous contents
Next: Operations during Extended Up: Minutes of the Previous: NASA Senior Science

SOHO Re-engineering Status Report

B.Worral gave a brief introduction with some background information: ISTP operation costs are about 40 M$/year (about 20M$ each for GSFC part and DSN); SOHO share is about 50% (both for GSFC and DSN part). DSN will charge usage in fiscal year 1998.

K.Walyus gave a report on the re-engineering status (see annex 9).



Bernhard Fleck
Tue Jan 6 15:27:26 EST 1998