B.Worral gave a brief introduction with some background information: ISTP operation costs are about 40 M$/year (about 20M$ each for GSFC part and DSN); SOHO share is about 50% (both for GSFC and DSN part). DSN will charge usage in fiscal year 1998.
K.Walyus gave a report on the re-engineering status (see annex 9).