WEEKLY MEETING MINUTES Week 12, March 15-21, 2004 1. Announcements ---------------- * Fuel estimate for the maneuver on 30 March is 0.0698 kg. * The hopefully final DSN schedule for the March keyhole is at: http://soho.nascom.nasa.gov/soc/keyhole.mar04 The file now includes all planned recordings between the first and last loss of VC1. The revised keyhole plot is at: http://sohowww.nascom.nasa.gov/soc/keyhole_mar04.pdf 2. Operations Constraints ------------------------- * NRT will be very tight starting on Week 12 and delayed command loads will need very large uplink windows (several days) in case station problems delay their uplink. There will also be more SVM activities than usual, at unusual times. Please check with Emily about ANY commanding plans. * UVCS safing on Monday evening * EIT Bakeout calibrations Wednesday night/Thursday morning * Transponder swap on Friday * Contact times for next week: 2004/03/15 04:00:00 - 2004/03/15 08:05:00 D34 2004/03/15 08:10:00 - 2004/03/15 12:55:00 D54 2004/03/15 21:30:00 - 2004/03/16 01:35:00 D24 2004/03/16 08:10:00 - 2004/03/16 12:55:00 D54 2004/03/16 22:55:00 - 2004/03/17 01:30:00 D24 2004/03/17 03:25:00 - 2004/03/17 06:15:00 D34 2004/03/17 11:30:00 - 2004/03/17 14:15:00 D63 D/L only 2004/03/17 19:15:00 - 2004/03/17 20:40:00 D15 D/L only 2004/03/17 23:00:00 - 2004/03/18 07:55:00 D34 2004/03/18 15:05:00 - 2004/03/18 17:40:00 D14 D/L only 2004/03/18 23:00:00 - 2004/03/19 01:25:00 D24 2004/03/19 04:55:00 - 2004/03/19 07:50:00 D34 2004/03/19 15:30:00 - 2004/03/19 19:30:00 D24 2004/03/19 21:50:00 - 2004/03/19 23:55:00 D43&D46 2004/03/20 02:15:00 - 2004/03/20 07:50:00 D34 2004/03/20 19:00:00 - 2004/03/20 22:00:00 D24 2004/03/20 21:45:00 - 2004/03/21 00:15:00 D43&D46 2004/03/21 02:20:00 - 2004/03/21 05:20:00 D34 2004/03/21 15:20:00 - 2004/03/21 19:20:00 D24 2004/03/21 21:45:00 - 2004/03/22 00:30:00 D43&D46 3. Coordinated Observations --------------------------- M Mar 15 (W12) T Mar 16 Last full day with High Rate on 26m stations, TBC TRACE engineering W Mar 17 TRACE engineering T Mar 18 EIT Bakeout begins TRACE engineering F Mar 19 Last day with High Rate on 34m stations, TBC, No High Rate after recorder and mag dump on D24 pass S Mar 20 S Mar 21 Other activities for Week 12: * Week 12 JOP136 Default RHESSI Collaborations (#6850), POC: Stein Haugan * Week 12 JOP159 CME's in Lyman-alpha (#6870), SWAN/LASCO/EIT POC: Chris St Cyr, Eric Quemerais * Mar/Apr JOP172 Coronal Micro-Events, RHESSI/TRACE/CDS/MDI/EIT, POC: Karel Schrijver (schryver@lmsal.com), TOO * Mar 18-Apr 4 EIT Bakeout Submodes: Submode 6 Planners for Week 12: CDS -- Peter Young MDI -- Sarah Gregory EIT -- Bob Leamon SUMER -- not observing LASCO -- Ops Team UVCS -- Rai Wu TRACE -- Ted Tarbell & Trish Jibben Relevant Notes -------------- CDS: Full spectral full sun scan on Monday. Polarity reversal monitoring (N & S poles) and quiet Sun spectral atlas on Tuesday. Flexible operations for the rest of the week. Weekend: usual weekend studies, GIS meridian study on Sunday. UVCS: Entering a safe configuration for the keyhole period on Monday. LASCO: C2/C3 synoptics, JOP159 Wednesday-Friday. EIT: 195 CME watch and synoptics until bakeout. MDI: 96 minute magnetograms. Full Disk Magnetograms and Doppler when VC2 availability allows. No VC2 expected starting Saturday. TRACE: Engineering through Thursday. Full Disk mosaics starting Friday. AOB: ---